Agapiou, A, Flanagan, R, Norman, G and Notman, D (1998) The changing role of builders' merchants in the construction supply-chain. Construction Management and Economics, 16(03), 351-61.

Atkinson, A R (1998) Human error in the management of building projects. Construction Management and Economics, 16(03), 339-49.

Bordoli, D W and Baldwin, A N (1998) A methodology for assessing construction project delays. Construction Management and Economics, 16(03), 327-37.

  • Type: Journal Article
  • Keywords: claim; critical path method; delay; project delay
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/014461998372358
  • Abstract:

    Different categories of delay and the different types of delay found on construction projects are identified. Existing methods for assessing the effect of delaying events are reviewed and the results of an industry survey presented. None of the commonly recognized methods for delay analysis allow the assessment of three important issues at the same time: the progress of the project at the time the delay occurred; the changing nature of the critical path; and the effects of action taken (or that should have been taken) to minimize potential delays. A new method of delay analysis is presented. This method takes into consideration all these issues, and is a clear, straightforward step-by-step approach to the calculation of the expected delay in the completion of the project as a result of delays in activities encountered during the project. It uses a dynamic model considered by both experts and practitioners to be the best method to take account of progress and form the basis of delay claims.

Egbu, C O, Young, B A and Torrance, V B (1998) Planning and control methods, tools and techniques used by refurbishment management. Construction Management and Economics, 16(03), 315-25.

Jensen, D A and Craig, J W (1998) Testing the validity of liquidated damages clauses: measuring the application preference and consistency of the intent test as applied by the United States court system. Construction Management and Economics, 16(03), 269-81.

Jensen, D A and Craig, J W (1998) The impact of TAMRA '88 on US construction accounting practices. Construction Management and Economics, 16(03), 303-13.

Raftery, J (1998) From Ptolemy to Heisenberg: quantitive models and reality. Construction Management and Economics, 16(03), 295-302.

Vidogah, W and Ndekugri, I E (1998) Improving the management of claims on construction contracts: consultants' perspective. Construction Management and Economics, 16(03), 363-72.

Wang, C-H, Wang, M-W and Huang, Y-C (1998) Hierarchical indices for measuring the effectiveness of construction automation implementation. Construction Management and Economics, 16(03), 257-67.

Yogeswaran, K, Kumaraswamy, M M and Miller, D R A (1998) Claims for extension of time in civil engineering projects. Construction Management and Economics, 16(03), 283-93.